Measurement-computing DASYLab User Manual Manual do Utilizador Página 51

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 76
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 50
DASYLab
© National Instruments Ireland Resources Limited | 5-3
real-time. The synchronization is like an additional invisible data channel
which uses computing time even when DASYLab is not executing an action.
DASYLab executes asynchronous actions directly after the condition is met.
An asynchronous action influences the data block processed by the executing
module. This need not be the data block that triggered the action. Use
asynchronous actions when the action is independent of the data to be
processed, for example, connecting and disconnecting channels to display
modules.
DASYLab executes asynchronous actions fast. If DASYLab does not trigger
an action, asynchronous actions do not need extra computing time, except for
the monitoring of the input channels.
Control Sequencer
Use the control sequencer as a worksheet test executive. The sequencer
connects worksheets and controls the sequence of worksheets using actions.
For example, use a sequencer to run different tests with different worksheets
in one experiment. The first worksheet generates calibration settings and
transfers these settings to the next worksheet. Then the second worksheet
controls the measurement acquisition and saves the measurement values in a
file. Finally the last worksheet analyzes and displays the measurement
values.
To create a sequencer for this test, click Sequencer on the function bar.
DASYLab opens the sequencer program window. Right-click the
Unknown root entry and select New Worksheet from the context menu. For
example, load the
Calibration worksheet. Then load the worksheets
Measure and Analyze consecutively. Right-click the first worksheet
Calibration and select Set Start Worksheet.
Then create the actions that control the worksheet sequence. Right-click the
Calibration worksheet and select New Action from the context menu.
Select the condition that the value of the variable VAR_101 changes and then
select the action
Load and start of the Measurement worksheet. Then
create a second similar action which loads and starts the worksheet
Analysis due to a value change of the VAR_2 variable.
If you now start the measurement, DASYLab loads the
Calibration
worksheet. The calibration runs until an action in this worksheet assigns a
new value to the VAR_101 variable. Then DASYLab loads the Measure
Vista de página 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 75 76

Comentários a estes Manuais

Sem comentários